Installation by an expert

Learn how experts install HOYA ONDOL products.

Play the expert installation video

Installation procedures

  •  

    1Clean the floor before laying insulation sheets

    • Field measurement / Complete layout and drawing plans
    • Clean the floor where HOYA ONDOL will be installed until no dust or foreign substance is left
    • Install insulation sheets on the completely clean floor
    • Take the direction of hot water pipes (to be installed) into consideration
  •  

    2Install the HOYA ONDOL base panel(sound insulating product)

    • Begin with one of the edge parts according to the layout plan
    • Check the joints and flatness after installing the base panel
  •  

    3Install hot water pipes

    • Use 12A XL pipes (outer diameter: 16 mm; inner diameter: 12 mm)
    • Begin with spots closest to the distributor; proceed with pipe installation along pipelines on the HOYA ONDOL base panel
    • Caution: Do not let the pipes bend when installing rotating parts
    • Leave the residual length of pipe at the parts to be connected with the distributor
    • Fill in any edge parts with filler foam
  •  

    4Install the HOYA ONDOL top panel

    • Install the top panel according to the binding site of the HOYA ONDOL base panel
    • Caution: Use tools such as a rubber hammer when joining the panel; do not cause deformation or damage
  •  

    5Connect the distributor

    • Join the installed hot water pipes and the distributor by using coupling sockets suitable for the size of the distributor
    • Make a right angle when joining the pipes and the distributor
  •  

    6Connect the boiler

    • If joining directly to the boiler, connect the distributor and the boiler pipe
    • Join by using coupling sockets suitable for the size of the distributor and the boiler
  •  

    77. Finishing the installation

    • Completion of HOYA ONDOL installation
  •  

    8Install the floor material

    • Discharge indoor air by operating the boiler, etc.
    • Check surface temperature through a test operation immediately after air discharge

    ※ Finish floor material installation (HOYA DOLMARU; strong floor, reinforcing floor, linoleum, tiles with decorations, etc.)

Installation procedures

  •  

    1Clean the floor before laying insulation sheets

    • Field measurement / Complete layout and drawing plans
    • Clean the floor where HOYA ONDOL will be installed until no dust or foreign substance is left
    • Install insulation sheets on the completely clean floor
    • Take the direction of hot water pipes (to be installed) into consideration
  •  

    2Install the HOYA ONDOL base panel(sound insulating product)

    • Begin with one of the edge parts according to the layout plan
    • Check the joints and flatness after installing the base panel
  •  

    3Install hot water pipes

    • Use 12A XL pipes (outer diameter: 16 mm; inner diameter: 12 mm)
    • Begin with spots closest to the distributor; proceed with pipe installation along pipelines on the HOYA ONDOL base panel
    • Caution: Do not let the pipes bend when installing rotating parts
    • Leave the residual length of pipe at the parts to be connected with the distributor
    • Fill in any edge parts with filler foam
  •  

    4Install the HOYA ONDOL top panel

    • Install the top panel according to the binding site of the HOYA ONDOL base panel
    • Caution: Use tools such as a rubber hammer when joining the panel; do not cause deformation or damage
  •  

    5Connect the distributor

    • Join the installed hot water pipes and the distributor by using coupling sockets suitable for the size of the distributor
    • Make a right angle when joining the pipes and the distributor
  •  

    6Connect the boiler

    • If joining directly to the boiler, connect the distributor and the boiler pipe
    • Join by using coupling sockets suitable for the size of the distributor and the boiler
  •  

    77. Finishing the installation

    • Completion of HOYA ONDOL installation
  •  

    8Install the floor material

    • Discharge indoor air by operating the boiler, etc.
    • Check surface temperature through a test operation immediately after air discharge

    ※ Finish floor material installation (HOYA DOLMARU; strong floor, reinforcing floor, linoleum, tiles with decorations, etc.)